Grand River Dam Authority Power For Progress Column June 10 2019

Power for Progress… A weekly column from the Grand River Dam Authority A reliable balancing act One of the interesting things about electricity is that it is the only real-time commodity bought and sold on the market. It most all cases, it is consumed as it is generated. Because of that, there is a delicate […]

GRDA Floodwater Release Bulletin: June 7 2019 4PM

Grand River Dam Authority News Release For immediate release: 6/7/19 At 4 PM on Friday, June 7: • Grand Lake elevation was 754.52 feet. Daily target elevation for June 6 is 744 feet. • At the direction of the United States Army Corps of Engineers, two (2) main spillway gates were open at Pensacola Dam, […]

GRDA Floodwater Release Bulletin: June 7, 2019, 10AM

Grand River Dam Authority News Release For immediate release: 6/7/19 At 10AM on Friday, June 7: • Grand Lake elevation was 754.53 feet. Daily target elevation for June 7 is 744 feet. • At the direction of the United States Army Corps of Engineers, two (2) main gates were open at Pensacola Dam, discharging 6,010 […]

Grand River Dam Authority Floodwater Release Bulletin

Grand River Dam Authority News Release For immediate release: 06/06/19 At 4:30 PM on Thursday, June 6: • Grand Lake elevation was 754.51 feet. Daily target elevation for June 6 is 744 feet. • At the direction of the United States Army Corps of Engineers, two (2) main spillway gates were open at Pensacola Dam, […]

Grand River Dam Authority Floodwater Release Bulletin

Grand River Dam Authority News Release For immediate release: 06/06/19 At 11 AM on Thursday, June 6: • Grand Lake elevation was 754.54 feet. Daily target elevation for June 6 is 744 feet. • At the direction of the United States Army Corps of Engineers, two (2) main and two (2) east spillway gates were […]

GRDA reminds the public to stay safe around hydroelectric facilities

Grand River Dam Authority News Release For immediate release: 5/2/19 GRDA reminds the public to stay safe around hydroelectric facilities With recent heavy rains in the Grand River watershed, along with floodgate operations at both Pensacola Dam (Grand Lake) and Robert S. Kerr Dam (Lake Hudson), the Grand River Dam Authority wants to remind the […]

Grand River Dam Authority Floodwater Release Bulletin

Grand River Dam Authority News Release  For immediate release: 06/04/19 At 11 AM on Tuesday, June 4: Grand Lake elevation was 754.76 feet. Daily target elevation for June 4 is 744 feet. At the direction of the United States Army Corps of Engineers, two (2) main and two (2) east spillway gates were open at Pensacola Dam, discharging​ 36,183 cubic feet […]

Grand River Dam Authority Floodwater Release Bulletin

Grand River Dam Authority News Release For immediate release: 06/01/19 At 5 PM on Saturday, June 1: Grand Lake elevation was 754.35 feet. Daily target elevation for June 1 is 744 feet. At the direction of the United States Army Corps of Engineers, three (3) main and two (2) east spillway gates were open at Pensacola Dam, discharging​ 45,696 cubic feet […]

Grand River Dam Authority Floodwater Release Bulletin

Grand River Dam Authority News Release For immediate release: 06/01/19  At 9 AM on Saturday, June 1: Grand Lake elevation was 754.27 feet. Daily target elevation for June 1 is 744 feet. At the direction of the United States Army Corps of Engineers, three (3) main and two (2) east spillway gates were open at Pensacola Dam, discharging​ 51,164 cubic feet […]

Grand River Dam Authority Floodwater Release Bulletin

Grand River Dam Authority News Release For immediate release: 05/31/19 At 1:30 PM on Friday, May 31: Grand Lake elevation was 754.20 feet. Daily target elevation for May 31 is 744 feet. At the direction of the United States Army Corps of Engineers, four (4) main and two (2) east spillway gates were open at Pensacola Dam, discharging​ 60,365 cubic feet […]