GRDA’s Rush for Brush coming in Fall 2025
The Grand River Dam Authority is announcing that its award-winning Rush for Brush workshops, typically held in spring, will take place in the fall this year. Facilitated by the GRDA Ecosystems and Watershed Management Department, the workshop is moving to the fall in order to ensure that enough materials are available for all participants. […]
Space Heater Safety
While Oklahoma winters can move the temperatures up and down the thermometer from one day to the next, many people find that using space heaters is a quick, convenient way to hold off the chill when necessary. However, space heaters, when not used properly, can pose both a fire and electric shock hazard. Safety should […]
GRDA to begin Salina Pumped Storage modernization work
After more than half a century of service, two of the hydroelectric pump-turbine units at the Grand River Dam Authority (GRDA) Salina Pumped Storage Project (SPSP) are scheduled for upgrades and modernization. Research associated with that work may also benefit other pumped storage projects across the United States. In October 2024, GRDA finalized an agreement […]
Notice to the Public
Please take notice that The Grand River Dam Authority has received an application for a private dock requiring directional bearing. Such directional bearing relates to a dock application for a private dock which if approved shall extend 154 feet across a cove, which measures 160 feet across from 745 feet mean sea level to 745 […]
Pryor’s Crisp joins GRDA Board
Pryor’s Jared Crisp, general manager of the Pryor Municipal Utility Board (MUB) has joined the Grand River Dam Authority Board of Directors as the representative for the Municipal Electric Systems of Oklahoma (MESO). He officially joined the board at its February 12 meeting in Chouteau and replaces outgoing board member Dwayne Elam. Crisp was named […]
Notice To The Public
Please take notice that The Grand River Dam Authority has received an application for a private dock requiring directional bearing. Such directional bearing relates to a dock application for a private dock which if approved shall extend 298 feet across a cove, which measures 130.9 feet across from 745 feet mean sea level to 745 […]