Staying cool, saving energy

Rain has certainly been an issue for several weeks now, but with 90-degree temperatures in the forecast for the days ahead, many air conditioners and fans will soon be working extra hard. If that is the case in your household, the Grand River Dam Authority hopes you will consider these cooling and energy saving tips, […]

Floodwater Release Bulletin

At 3 PM on Friday, June 13: Grand Lake elevation was 749.85 feet. At the direction of the United States Army Corps of Engineers, one main spillway gate and three east spillway gates were open at Pensacola Dam, discharging 13,667 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam […]

2025 June Board Meeting

The June board meeting will be held on Wednesday the 18th at 10:00 a.m. at the GRDA Administrative Building in Chouteau, Ok. Proposed Agenda Final Agenda

Floodwater Release Bulletin

At 1:45 PM on Wednesday, June 11: Grand Lake elevation was 750.36 feet. At the direction of the United States Army Corps of Engineers, one main spillway gate and three east spillway gates were open at Pensacola Dam, discharging 13,667 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam […]

Floodwater Release Bulletin

At 10:45 AM on Wednesday, June 11: Grand Lake elevation was 750.36 feet. At the direction of the United States Army Corps of Engineers, one main spillway gate and three east spillway gates were open at Pensacola Dam, discharging 13,667 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam […]

Floodwater Release Bulletin

At 8:45 AM on Wednesday, June 11: Grand Lake elevation was 750.36 feet. At the direction of the United States Army Corps of Engineers, one main spillway gate and four east spillway gates were open at Pensacola Dam, discharging 29,768 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam […]

Floodwater Release Bulletin

At 3:45 PM on Monday, June 9: Grand Lake elevation was 751.73 feet. At the direction of the United States Army Corps of Engineers, two main spillway gates and four east spillway gates were open at Pensacola Dam, discharging 48,456 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam […]

Floodwater Release Bulletin

At 12:15 PM on Sunday, June 8: Grand Lake elevation was 750.39 feet. At the direction of the United States Army Corps of Engineers, one main spillway gate and three east spillway gates were open at Pensacola Dam, discharging 25,450 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam […]

Floodwater Release Bulletin

At 3:40 PM on Saturday, June 7: Grand Lake elevation was 748.08 feet. At the direction of the United States Army Corps of Engineers, one main spillway gate and three east spillway gates were open at Pensacola Dam, discharging 6,716 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam […]

Floodwater Release Bulletin

At 3:35 PM on Thursday, June 5: Grand Lake elevation was 746.43 feet. At the direction of the United States Army Corps of Engineers, three main spillway gates and five east spillway gates were open at Pensacola Dam, discharging 35,001 cubic feet per second (cfs) of water. Four units were online at the Pensacola Dam […]