Floodwater Release Bulletin
At 1:30 PM on Tuesday, June 30: Grand Lake elevation was 750.14 feet. At the direction of the United States Army Corps of Engineers, one main spillway gate and one east gate were open at Pensacola Dam, discharging 12,314 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, […]
Floodwater Release Bulletin
At 3:30 PM on Monday, June 29: Grand Lake elevation was 749.93 feet. At the direction of the United States Army Corps of Engineers, two main spillway gates and one east gate were open at Pensacola Dam, discharging 27,388 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, […]
Enjoy Summer 2026!
It is officially summer in Oklahoma, meaning that most of us are spending more time outdoors. And of course, here in Oklahoma, there is always plenty to do out there. Whether the activity involves visiting some of the 70,000 surface acres of water managed by the Grand River Dam Authority (Grand and Hudson lakes and […]
Floodwater Release Bulletin
At 11:30 AM on Sunday, June 28: Grand Lake elevation was 749.66 feet. At the direction of the United States Army Corps of Engineers, two main spillway gates and one east gate were open at Pensacola Dam, discharging 27,388 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, […]
Floodwater Release Bulletin
At 10 AM on Friday, June 26: Grand Lake elevation was 746.48 feet. At the direction of the United States Army Corps of Engineers, one main spillway gate and three east gates were open at Pensacola Dam, discharging 6,534 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, […]
Floodwater Release Bulletin
At 2:30 PM on Thursday, June 25: Grand Lake elevation was 746.69 feet. At the direction of the United States Army Corps of Engineers, two main spillway gates and three east gates were open at Pensacola Dam, discharging 25,022 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, […]
Floodwater Release Bulletin
At 9 AM on Wednesday, June 24: Grand Lake elevation was 747.30 feet. At the direction of the United States Army Corps of Engineers, three main spillway gates and four east gates were open at Pensacola Dam, discharging 39,754 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, […]
Floodwater Release Bulletin
At 12:30 PM on Tuesday, June 23: Grand Lake elevation was 747.36 feet. At the direction of the United States Army Corps of Engineers, three main spillway gates and four east gates were open at Pensacola Dam, discharging 39,754 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, […]
Floodwater Release Bulletin
At 9:30 AM on Tuesday, June 23: Grand Lake elevation was 747.33 feet. At the direction of the United States Army Corps of Engineers, two main spillway gates and two east gates were open at Pensacola Dam, discharging 24,792 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, […]
Floodwater Release Bulletin
At 9:45AM on Monday, June 22: Grand Lake elevation was 746.10 feet At the direction of the United States Army Corps of Engineers, one east gate was open at Pensacola Dam, discharging 7,642 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, releasing 13,108 cfs of water through […]