Floodwater Release Bulletin

At 12:30 PM on Tuesday, May 6: Grand Lake elevation was 744.63 feet. At the direction of the United States Army Corps of Engineers, one (1) main spillway and two (2) east spillway gates were open at Pensacola Dam, discharging 644 cubic feet per second (cfs) of water. Six (6) units were online at the […]

Floodwater Release Bulletin

At 10:20 AM on Monday, May 5: Grand Lake elevation was 745.29 feet. At the direction of the United States Army Corps of Engineers, one (1) main spillway and seven (7) east spillway gates were open at Pensacola Dam, discharging 11,430 cubic feet per second (cfs) of water. Six (6) units were online at the […]

Floodwater Release Bulletin

At 1:40 PM on Sunday, May 4: Grand Lake elevation was 746.41 feet. At the direction of the United States Army Corps of Engineers, seven (7) floodgates were open at Pensacola Dam, discharging 28,574 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,221 cfs of […]

Floodwater Release Bulletin

At 6PM on Friday, May 2: Grand Lake elevation was 748.16 feet. At the direction of the United States Army Corps of Engineers, seven (7) gates were open at Pensacola Dam, discharging 28,574 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,221 cfs of water through […]

Floodwater Release Bulletin

At 6:20 PM on Thursday, May 1: Grand Lake elevation was 747.79 feet. At the direction of the United States Army Corps of Engineers, two (2) main spillway and five (5) east spillway gates were open at Pensacola Dam, discharging 28,574 cubic feet per second (cfs) of water. Six (6) units were online at the […]

Floodwater Release Bulletin

At 4PM on Wednesday, April 30: Grand Lake elevation was 746.57 feet. At the direction of the United States Army Corps of Engineers, two (2) main spillway and five (5) east spillway gates were open at Pensacola Dam, discharging 28,574 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing […]

Floodwater Release Bulletin

At 9:45 AM on Wednesday, April 30: Grand Lake elevation was 745.75 feet. At the direction of the United States Army Corps of Engineers, one (1) main spillway and three (3) east spillway gates were open at Pensacola Dam, discharging 13,600 cubic feet per second (cfs) of water. Six (6) units were online at the […]

Floodwater Release Bulletin

At 10:45 AM on Tuesday, April 29: Grand Lake elevation was 744.69 feet. At the direction of the United States Army Corps of Engineers, one (1) east spillway gate was open at Pensacola Dam, discharging 166 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,673 […]

Floodwater Release Bulletin

At 10:50 AM on Monday, April 28: Grand Lake elevation was 744.97 feet. At the direction of the United States Army Corps of Engineers, one (1) main spillway and one (1) east spillway gates were open at Pensacola Dam, discharging 1,620 cubic feet per second (cfs) of water. Six (6) units were online at the […]

Floodwater Release Bulletin

At 1 PM on Sunday, April 27: Grand Lake elevation was 745.21 feet. At the direction of the United States Army Corps of Engineers, one (1) main spillway and one (1) east spillway gates were open at Pensacola Dam, discharging 1,919 cubic feet per second (cfs) of water. Six (6) units were online at the […]