Floodwater Release Bulletin
At 2 PM on Monday, May 26: Grand Lake elevation was 743.97 feet. One (1) main spillway was open at Pensacola Dam, discharging 280 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 12,769 cfs of water through generation. Releases through floodgates and generation totaled 13,049 […]
Floodwater Release Bulletin
At 2:10 PM on Sunday, May 25: Grand Lake elevation was 743.59 feet. One (1) main spillway was open at Pensacola Dam, discharging 535 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 12,769 cfs of water through generation. Releases through floodgates and generation totaled 13,304 […]
Floodwater Release Bulletin
At 6:30 PM on Friday, May 23: Grand Lake elevation was 744.16 feet. One (1) main spillway was open at Pensacola Dam, discharging 7,134 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 12,242 cfs of water through generation. Releases through floodgates and generation totaled 19,376 […]
At 2:10 PM on Thursday, May 8: Grand Lake elevation was 744.14 feet. No floodgates were open at Pensacola Dam. Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,334 cfs of water through generation. Inflows into Grand Lake totaled 7,347 cfs. Lake Hudson elevation was 623.44 feet. No floodgates were open at […]
Floodwater Release Bulletin
At 1:45 PM on Wednesday, May 7: Grand Lake elevation was 744.34 feet. At the direction of the United States Army Corps of Engineers, two (2) east spillway gates were open at Pensacola Dam, discharging 152 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,108 […]
Floodwater Release Bulletin
At 9:45 AM on Wednesday, May 7: Grand Lake elevation was 744.41 feet. At the direction of the United States Army Corps of Engineers, two (2) east spillway gates were open at Pensacola Dam, discharging 310 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,221 […]
Floodwater Release Bulletin
At 12:30 PM on Tuesday, May 6: Grand Lake elevation was 744.63 feet. At the direction of the United States Army Corps of Engineers, one (1) main spillway and two (2) east spillway gates were open at Pensacola Dam, discharging 644 cubic feet per second (cfs) of water. Six (6) units were online at the […]
Floodwater Release Bulletin
At 10:20 AM on Monday, May 5: Grand Lake elevation was 745.29 feet. At the direction of the United States Army Corps of Engineers, one (1) main spillway and seven (7) east spillway gates were open at Pensacola Dam, discharging 11,430 cubic feet per second (cfs) of water. Six (6) units were online at the […]
Floodwater Release Bulletin
At 1:40 PM on Sunday, May 4: Grand Lake elevation was 746.41 feet. At the direction of the United States Army Corps of Engineers, seven (7) floodgates were open at Pensacola Dam, discharging 28,574 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,221 cfs of […]
Floodwater Release Bulletin
At 6PM on Friday, May 2: Grand Lake elevation was 748.16 feet. At the direction of the United States Army Corps of Engineers, seven (7) gates were open at Pensacola Dam, discharging 28,574 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,221 cfs of water through […]