Grand River Dam Authority Floodwater Release Bulletin

Grand River Dam Authority News Release For immediate release: 05/29/19 At 9:30 AM on Wednesday, May 29: • Grand Lake elevation was 754.29 feet. Daily target elevation for May 29 is 743.87 feet. • At the direction of the United States Army Corps of Engineers, five (5) main and two (2) east spillway gates were […]

GRDA News Release: Floodwater Release Bulletin May 23 3 PM

Grand River Dam Authority News Release For immediate release: 05/23/19 At 3PM on Thursday, May 23: • Grand Lake elevation was 754.86 feet. Daily target elevation for May 23 is 743.47 feet. • At the direction of the United States Army Corps of Engineers, nine (9) main and three (3) east spillway gates were open […]

GRDA Floodwater Release Bulletin: May 22 2019, 1 PM

Grand River Dam Authority News Release For immediate release: 05/22/19 At 1PM on Wednesday, May 22: • Grand Lake elevation was 754.78 feet. Daily target elevation for May 22 is 743.40 feet. • At the direction of the United States Army Corps of Engineers, seven (7) main and three (3) east spillway gates were open […]