At 6 pm on Tuesday, June 29: Grand Lake elevation was 747.19 feet. At the direction of the United States Army Corps of Engineers, five (5) main spillway gates were open at Pensacola Dam, discharging 48,450 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,220 […]
Floodwater Release Bulletin
At noon on Tuesday, June 29: Grand Lake elevation was 747.03 feet. At the direction of the United States Army Corps of Engineers, four (4) main spillway gates were open at Pensacola Dam, discharging 31,640 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,018 cfs […]
Floodwater Release Bulletin
At 1 PM on Sunday, June 27: Grand Lake elevation was 745.86 feet. At the direction of the United States Army Corps of Engineers, four (4) main spillway gates were open at Pensacola Dam, discharging 28,386 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 12,897 […]
Floodwater Release Bulletin
At 3 PM on Saturday, June 26: Grand Lake elevation was 744.66 feet. At the direction of the United States Army Corps of Engineers, two (2) main spillway gates were open at Pensacola Dam, discharging 15,100 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 12,835 […]
Floodwater Release Bulletin
At 7 pm on Monday, March 22: Grand Lake elevation was 745.07 feet. At the direction of the United States Army Corps of Engineers, one (1) main spillway gate was open at Pensacola Dam, discharging 7,892 cubic feet per second (cfs) of water. Five (5) units were online at the Pensacola Dam powerhouse, releasing 11,348 […]
Floodwater Release Bulletin
At 4 PM on Monday, March 22: Grand Lake elevation was 745.06 feet. At the direction of the United States Army Corps of Engineers, three (3) main spillway gates were open at Pensacola Dam, discharging 23,577 cubic feet per second (cfs) of water. Five (5) units were online at the Pensacola Dam powerhouse, releasing 11,234 […]
Floodwater Release Bulletin
At noon on Sunday, March 21: Grand Lake elevation was 745.62 feet. At the direction of the United States Army Corps of Engineers, five (5) main spillway gates were open at Pensacola Dam, discharging 41,750 cubic feet per second (cfs) of water. Five (5) units were online at the Pensacola Dam powerhouse, releasing 11,330 cfs […]
Floodwater Release Bulletin
At noon on Thursday, March 18: Grand Lake elevation was 746.62 feet. At the direction of the United States Army Corps of Engineers, six (6) main spillway gates were open at Pensacola Dam, discharging 55,104 cubic feet per second (cfs) of water. Five (5) units were online at the Pensacola Dam powerhouse, releasing 11,440 cfs […]
Floodwater Release Bulletin
At 1 pm on Monday, March 15: Grand Lake elevation was 746.53 feet. At the direction of the United States Army Corps of Engineers, six (6) main spillway gates were open at Pensacola Dam, discharging 54,654 cubic feet per second (cfs) of water. Five (5) units were online at the Pensacola Dam powerhouse, releasing 11,532 […]
Floodwater Release Bulletin
At 1 pm on Sunday, March 14: Grand Lake elevation was 745.57 feet. At the direction of the United States Army Corps of Engineers, five (5) main spillway gates were open at Pensacola Dam, discharging 41,545 cubic feet per second (cfs) of water. Five (5) units were online at the Pensacola Dam powerhouse, releasing 11,528 […]