
Media Kit
GRDA media kit is a promotional material collection showcasing the company’s brand and photos. This access includes downloadable images, videos, press releases, and other relevant information to help you use our brand and assets, including our logo, content, and trademarks, without having to negotiate legal agreements for each use.
Social Media
Special Announcement
News
May 08, 2025
At 2:10 PM on Thursday, May 8: Grand Lake elevation was 744.14 feet. No floodgates were open at Pensacola Dam. Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,334 cfs of water through generation. Inflows into Grand Lake totaled 7,347 cfs. Lake Hudson elevation was 623.44 feet. No floodgates were open at […]
Floodwater Release Bulletin
May 07, 2025
At 1:45 PM on Wednesday, May 7: Grand Lake elevation was 744.34 feet. At the direction of the United States Army Corps of Engineers, two (2) east spillway gates were open at Pensacola Dam, discharging 152 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,108 […]
Floodwater Release Bulletin
May 07, 2025
At 9:45 AM on Wednesday, May 7: Grand Lake elevation was 744.41 feet. At the direction of the United States Army Corps of Engineers, two (2) east spillway gates were open at Pensacola Dam, discharging 310 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,221 […]
GRDA Police: Safety reminders for boating on elevated lake levels
May 06, 2025
With recent heavy rains across Oklahoma and in the Grand River watersheds, the Grand River Dam Authority Police Department is sharing some important safety tips for those who will be visiting Grand Lake and Lake Hudson in the coming days. Although lakes are expected to return to more normal elevations soon, these are important tips […]
Floodwater Release Bulletin
May 06, 2025
At 12:30 PM on Tuesday, May 6: Grand Lake elevation was 744.63 feet. At the direction of the United States Army Corps of Engineers, one (1) main spillway and two (2) east spillway gates were open at Pensacola Dam, discharging 644 cubic feet per second (cfs) of water. Six (6) units were online at the […]
Floodwater Release Bulletin
May 05, 2025
At 10:20 AM on Monday, May 5: Grand Lake elevation was 745.29 feet. At the direction of the United States Army Corps of Engineers, one (1) main spillway and seven (7) east spillway gates were open at Pensacola Dam, discharging 11,430 cubic feet per second (cfs) of water. Six (6) units were online at the […]
Floodwater Release Bulletin
May 04, 2025
At 1:40 PM on Sunday, May 4: Grand Lake elevation was 746.41 feet. At the direction of the United States Army Corps of Engineers, seven (7) floodgates were open at Pensacola Dam, discharging 28,574 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,221 cfs of […]
Floodwater Release Bulletin
May 02, 2025
At 6PM on Friday, May 2: Grand Lake elevation was 748.16 feet. At the direction of the United States Army Corps of Engineers, seven (7) gates were open at Pensacola Dam, discharging 28,574 cubic feet per second (cfs) of water. Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,221 cfs of water through […]
Owasso’s Fuller joins GRDA Board
May 02, 2025
Nicki Fuller (Owasso), general manager and chief executive officer (CEO) of the Oklahoma Association of Electric Cooperatives (OAEC), has joined the Grand River Dam Authority (GRDA) Board of Directors. Fuller replaces outgoing Director Chris Meyers (Edmond) as the board’s electric cooperative representative. Fuller has served as OAEC GM/CEO since April 1st, following Meyers, who retired […]
Floodwater Release Bulletin
May 01, 2025
At 6:20 PM on Thursday, May 1: Grand Lake elevation was 747.79 feet. At the direction of the United States Army Corps of Engineers, two (2) main spillway and five (5) east spillway gates were open at Pensacola Dam, discharging 28,574 cubic feet per second (cfs) of water. Six (6) units were online at the […]