Floodwater Release Bulletin

At 8 AM on Tuesday, July 14: Grand Lake elevation was 745.04 feet. At the direction of the United States Army Corps of Engineers, one main spillway gate was open at Pensacola Dam, discharging 627 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, releasing 12,882 cfs of […]

Floodwater Release Bulletin

At 10AM on Monday, July 13: Grand Lake elevation was 745.37 feet. At the direction of the United States Army Corps of Engineers, one main spillway gate was open at Pensacola Dam, discharging 7,165 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, releasing 12,995 cfs of water […]

Floodwater Release Bulletin

At 1:30 PM on Sunday, July 12: Grand Lake elevation was 745.34 feet. At the direction of the United States Army Corps of Engineers, one main spillway gate was open at Pensacola Dam, discharging 313 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, releasing 12,882 cfs of […]

Floodwater Release Bulletin

At 1:45 PM on Saturday, July 11: Grand Lake elevation was 745.34 feet. At the direction of the United States Army Corps of Engineers, one main spillway gate was open at Pensacola Dam, discharging 627 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, releasing 12,882 cfs of […]

Floodwater Release Bulletin

At 12:30 PM on Thursday, July 9: Grand Lake elevation was 746.26 feet. At the direction of the United States Army Corps of Engineers, one main spillway gate was open at Pensacola Dam, discharging 7,088 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, releasing 12,995 cfs of […]

Floodwater Release Bulletin

At noon on Tuesday, July 7: Grand Lake elevation was 747.71 feet. At the direction of the United States Army Corps of Engineers, two main spillway gates were open at Pensacola Dam, discharging 15,928 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, releasing 13,334 cfs of water […]

Floodwater Release Bulletin

At 12:15 PM on Wednesday, July 1: Grand Lake elevation was 750.08 feet. At the direction of the United States Army Corps of Engineers, one main spillway gate was open at Pensacola Dam, discharging 6,765 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, releasing 12,769 cfs of […]

Floodwater Release Bulletin

At 8:40 AM on Wednesday, July 1: Grand Lake elevation was 750.17 feet. At the direction of the United States Army Corps of Engineers, one main spillway gate and one east gate were open at Pensacola Dam, discharging 12,033 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, […]

Floodwater Release Bulletin

At 1:30 PM on Tuesday, June 30: Grand Lake elevation was 750.14 feet. At the direction of the United States Army Corps of Engineers, one main spillway gate and one east gate were open at Pensacola Dam, discharging 12,314 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, […]

Floodwater Release Bulletin

At 3:30 PM on Monday, June 29: Grand Lake elevation was 749.93 feet. At the direction of the United States Army Corps of Engineers, two main spillway gates and one east gate were open at Pensacola Dam, discharging 27,388 cubic feet per second (cfs) of water. Six units were online at the Pensacola Dam powerhouse, […]