Skip to content

Media Kit

GRDA media kit is a promotional material collection showcasing the company’s brand and photos. This access includes downloadable images, videos, press releases, and other relevant information to help you use our brand and assets, including our logo, content, and trademarks, without having to negotiate legal agreements for each use.

Social Media

Special Announcement

Public Notice for GRDA Lake and Water Customers – Delay for Dock and Water 2024 Invoices

Due to system-related issues and labor shortages, GRDA dock and water invoices will be slightly delayed in going out for 2024.

  • The current estimate for private dock billing is expected to be completed by April 15, 2024.
  • The current estimate for raw water billing is expected to be completed by May 15, 2024.

Thank you for your patience as we work through these challenges.

 

News

Duck Creek ramp replacement project on Grand Lake now complete

The Grand River Dam Authority wants to let the public know that the Duck Creek ramp replacement on Grand Lake is now complete and is open to the public. The ramp replacement at the GRDA hangar, near Red Arrow should be completed tomorrow, Thursday, April 22. GRDA appreciated the public’s cooperation while this work was […]

Notice of Public Meeting

The Grand River Dam Authority (GRDA) will hold a public meeting on Tuesday, April 27th at 9:00 AM in person with a virtual option for the commercial application in the name of Grand Lake RV Resort. The purpose of this meeting is to obtain public comments regarding the construction of 4 new docks in the […]

GRDA recognized for exceptional electric reliability in 2020

For the second straight year, and the third time in four years, the Grand River Dam Authority has received national recognition for achieving exceptional electric reliability. The recognition comes from the American Public Power Association (APPA), a trade group that represents more than 2,000 not-for-profit, community-owned electric utilities. APPA helps electric utilities track power outage […]

Notice to the Public

Please take notice that The Grand River Dam Authority has received an application for a private dock requiring directional bearing. Such directional bearing relates to a dock application for a private dock which if approved shall extend 85 feet across a cove. Applicant: Larry Duff Location: Ketchum Cove Lake Address: 35080 Cohea Lane, Afton, Ok […]

Floodwater Release Bulletin

At 7 pm on Monday, March 22: Grand Lake elevation was 745.07 feet. At the direction of the United States Army Corps of Engineers, one (1) main spillway gate was open at Pensacola Dam, discharging 7,892 cubic feet per second (cfs) of water. Five (5) units were online at the Pensacola Dam powerhouse, releasing 11,348 […]

Floodwater Release Bulletin

At 4 PM on Monday, March 22: Grand Lake elevation was 745.06 feet. At the direction of the United States Army Corps of Engineers, three (3) main spillway gates were open at Pensacola Dam, discharging 23,577 cubic feet per second (cfs) of water. Five (5) units were online at the Pensacola Dam powerhouse, releasing 11,234 […]

Floodwater Release Bulletin

At noon on Sunday, March 21: Grand Lake elevation was 745.62 feet. At the direction of the United States Army Corps of Engineers, five (5) main spillway gates were open at Pensacola Dam, discharging 41,750 cubic feet per second (cfs) of water. Five (5) units were online at the Pensacola Dam powerhouse, releasing 11,330 cfs […]

Floodwater Release Bulletin

At noon on Thursday, March 18: Grand Lake elevation was 746.62 feet. At the direction of the United States Army Corps of Engineers, six (6) main spillway gates were open at Pensacola Dam, discharging 55,104 cubic feet per second (cfs) of water. Five (5) units were online at the Pensacola Dam powerhouse, releasing 11,440 cfs […]

GRDA to host Rush for Brush Workshop in April

The Grand River Dam Authority Ecosystems and Watershed Management Department is announcing that its next Rush for Brush workshop is scheduled for Saturday, April 17, at Wolf Creek Park in Grove, beginning at 9AM. Due to limited materials available for this workshop, organizers anticipate 60 people will be able to attend. Registration is now open. […]

1 15 16 17 18 19 42