News
Floodwater Release Bulletin
May 05, 2022
At 1 PM on Thursday, May 5:
- Grand Lake elevation was 744.55 feet.
- At the direction of the United States Army Corps of Engineers, two (2) main spillway gates were open at Pensacola Dam, discharging 14,918 cubic feet per second (cfs) of water.
- Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,531 cfs of water through generation.
- Releases through floodgates and generation totaled 28,449 cfs.
- Inflows into Grand Lake totaled 108,964 cfs.
- Lake Hudson elevation was 621.85 feet.
- At the direction of the United States Army Corps of Engineers, thirteen (13) gates were open at Robert S. Kerr Dam, discharging 27,486 cfs of water.
- Four (4) units were online at the Robert S. Kerr Dam powerhouse, releasing 29,970 cfs of water through generation.
- Releases through floodgates and generation totaled 57,456 cfs.
- Inflows into Lake Hudson totaled 40,632 cfs.
Additional information can be found by visiting: http://stormops.grda.tech/riveroperations