News
Floodwater Release Bulletin
Jun 09, 2022
At noon on Thursday, June 9:
- Grand Lake elevation was 745.05 feet.
- At the direction of the United States Army Corps of Engineers, four (4) east spillway gates were open at Pensacola Dam, discharging 4,449 cubic feet per second (cfs) of water.
- Six (6) units were online at the Pensacola Dam powerhouse, releasing 12,791 cfs of water through generation.
- Releases through floodgates and generation totaled 17,240 cfs.
- Inflows into Grand Lake totaled 7,516 cfs.
- Lake Hudson elevation was 619.52 feet.
- At the direction of the United States Army Corps of Engineers, one (1) gate was open at Robert S. Kerr Dam, discharging 231 cubic feet per second (cfs) of water.
- Four (4) units were online at the Robert S. Kerr Dam powerhouse, releasing 19,440 cfs of water through generation.
- Releases through floodgates and generation totaled 19,671 cfs.
- Inflows into Lake Hudson totaled 17,544 cfs.
Additional information can be found by visiting: http://stormops.grda.tech/riveroperations