News
Floodwater Release Bulletin
May 14, 2024
At 11 AM on Tuesday, May 14:
- Grand Lake elevation was 745.07 feet.
- At the direction of the United States Army Corps of Engineers, one (1) main spillway gate was open at Pensacola Dam, discharging 631 cubic feet per second (cfs) of water.
- Six (6) units were online at the Pensacola Dam powerhouse, releasing 13,221 cfs of water through generation.
- Releases through floodgates and generation totaled 13,852 cfs.
- Inflows into Grand Lake totaled 13,950 cfs.
- Lake Hudson elevation was 619.84 feet.
- No floodgates were open at Robert S. Kerr Dam
- One (1) unit was online at the Robert S. Kerr Dam powerhouse, releasing 7,560 cfs of water through generation.
- Inflows into Lake Hudson totaled 14,785 cfs.
Additional information can be found by visiting: http://stormops.grda.tech/riveroperations