At 10 AM on Monday, January 27:
- Grand Lake elevation was 745.35 feet. Daily target elevation for January 27 is 742 feet.
- At the direction of the United States Army Corps of Engineers, one (1) main and four (4) east spillway gates were open at Pensacola Dam, discharging 9,410 cubic feet per second (cfs) of water.
- Five (5) units were online at the Pensacola Dam powerhouse, releasing 11,110 cfs of water through generation.
- Releases through floodgates and generation totaled 20,520 cfs.
- Inflows into Grand Lake totaled 9,060 cfs.
- Lake Hudson elevation was 620.71 feet. Normal elevation is 619 feet.
- Four (4) units were online at the Robert S. Kerr Dam powerhouse.
- Releases through generation totaled 32,130 cfs.
- Inflows into Lake Hudson totaled 21,476 cfs.
# # #