At 5 PM on Thursday, February 13:
- Grand Lake elevation was 744.07 feet. Daily target elevation for February 13 is 742 feet.
- At the direction of the United States Army Corps of Engineers, three (3) main spillway gates were open at Pensacola Dam, discharging 9,036 cubic feet per second (cfs) of water.
- Five (5) units were online at the Pensacola Dam powerhouse, releasing 11,175 cfs of water through generation.
- Releases through floodgates and generation totaled 20,211 cfs.
- Inflows into Grand Lake totaled 15,349 cfs.
- Lake Hudson elevation was 621.15 feet. Normal elevation is 619 feet.
- Four (4) units were online at the Robert S. Kerr Dam powerhouse.
- Releases through generation totaled 32,400 cfs.
- Inflows into Lake Hudson totaled 23,136 cfs.
# # #